Well completion report--G. Friemel No. 1 (PD-5) well, Palo Duro Basin, Texas : unanalyzed data technical report /

" ... a part of a nationwide program to identify potential locations for a nuclear waste repository. ... Drilling of the well started on February 23, 1982, and was completed on March 31, 1982, at a total depth of 2,710 feet. These data are preliminary. They have been neither analyzed nor evalua...

Full description

Main Author: Stone and Webster Engineering Corporation.
Other Authors: Battelle Memorial Institute. Office of Nuclear Waste Isolation.
Format: Book
Language: English
Published: Columbus, Oh. : [Springfield, VA] : Battelle Memorial Institute ; [Available from National Technical Information Service], 1984.
Physical Description: v, 9 pages (some folded) : illustrations ; 28 cm + 11 microfiche.
Series: BMI/SRP (Series) ; 5003.
Subjects:
LEADER 02923cam a2200529Ka 4500
001 11256880
003 OCoLC
005 20130319105218.0
008 841012e198405 ohua bt f000 0 eng d
035 |a (OCoLC)11256880 
040 |a AFT  |b eng  |c AFT  |d OCLCQ  |d COM 
043 |a n-us-tx 
049 |a COMA 
088 |a BMI/SRP-5003 
090 |a TD812  |b .S76 BMI/SRP-5003 1984 
110 2 |a Stone and Webster Engineering Corporation. 
245 1 0 |a Well completion report--G. Friemel No. 1 (PD-5) well, Palo Duro Basin, Texas : unanalyzed data :  |b technical report /  |c Stone & Webster Engineering Corporation ; prepared for Office of Nuclear Waste Isolation, Battelle Memorial Institute, Columbus, OH. 
246 3 |a Palo Duro Basin, Texas: unanalyzed data, well completion report. 
260 |a Columbus, Oh. :  |b Battelle Memorial Institute ;  |a [Springfield, VA] :  |b [Available from National Technical Information Service],  |c 1984. 
300 |a v, 9 pages (some folded) :  |b illustrations ;  |c 28 cm  |e + 11 microfiche. 
336 |a text  |b txt  |2 rdacontent. 
337 |a unmediated  |b n  |2 rdamedia. 
338 |a volume  |b nc  |2 rdacarrier. 
490 1 |a BMI/SRP (Series) ;  |v 5003. 
500 |a "May 1984." 
536 |a "The content of this report was effective as of April 1984. This report was prepared by Stone & Webster Engineering Corporation under Subcontract E512-05000 with Battelle Project Management Division, Office of Nuclear Waste Isolation under  |b Contract Nos. DE-AC06-76RLO1830 and DE-AC02-83CH10140 with the U.S. Department of Energy".--t.p. 
504 |a Includes bibliographical references (page 25). 
520 |a " ... a part of a nationwide program to identify potential locations for a nuclear waste repository. ... Drilling of the well started on February 23, 1982, and was completed on March 31, 1982, at a total depth of 2,710 feet. These data are preliminary. They have been neither analyzed nor evaluated." abstract.--p. i. 
513 |a Preliminary report.  |b February-March 1982. 
650 0 |a Radioactive waste disposal. 
655 7 |a Technical reports.  |2 lcgft. 
710 2 |a Battelle Memorial Institute.  |b Office of Nuclear Waste Isolation. 
830 0 |a BMI/SRP (Series) ;  |v 5003. 
907 |a .b37924047  |b cu   |c -  |d 130319  |e 230627 
998 |a cu  |b 130319  |c m  |d a   |e -  |f eng  |g ohu  |h 0  |i 0 
948 |a MARCIVE Comp, in 2022.12 
948 |a MARCIVE Comp, 09/2020 
948 |a MARCIVE Comp, 2018.05 
948 |a MARCIVE August, 2017 
948 |a MARCIVE extract Aug 5, 2017 
994 |a C0  |b COM 
995 |a Loaded with m2btab.ltiac in 2022.12 
995 |a Loaded with m2btab.ltiac in 2020.09 
995 |a Loaded with m2btab.ltiac in 2018.06 
995 |a Loaded with m2btab.ltiac in 2017.08 
995 |a Exported from Connexion by CMU 
989 |a BMI/SRP  |a 5003  |d culsr  |b 1080005916085  |e  - -   |f  - -   |g o   |h 0  |i 0  |j 175  |k 130319  |l $0.00  |m    |n  - -   |o -  |p 0  |q 0  |t 0  |x 0  |1 .i75954230