Well completion report--G. Friemel No. 1 (PD-5) well, Palo Duro Basin, Texas : unanalyzed data technical report /
" ... a part of a nationwide program to identify potential locations for a nuclear waste repository. ... Drilling of the well started on February 23, 1982, and was completed on March 31, 1982, at a total depth of 2,710 feet. These data are preliminary. They have been neither analyzed nor evalua...
Main Author: | Stone and Webster Engineering Corporation. |
---|---|
Other Authors: | Battelle Memorial Institute. Office of Nuclear Waste Isolation. |
Format: | Book |
Language: | English |
Published: |
Columbus, Oh. : [Springfield, VA] :
Battelle Memorial Institute ; [Available from National Technical Information Service],
1984.
|
Physical Description: |
v, 9 pages (some folded) : illustrations ; 28 cm + 11 microfiche. |
Series: |
BMI/SRP (Series) ;
5003. |
Subjects: |
CMU Spec Coll Energy 3rd Floor
Location | Call Number: | Status |
---|---|---|
CMU Spec Coll Energy 3rd Floor | BMI/SRP 5003 | Available |