Defense logistics DOD input needed on implementing depot maintenance study recommendations /
Saved in:
Main Author: | Edwards, Jack E. |
---|---|
Other Authors: | United States. Government Accountability Office. |
Format: | Electronic |
Language: | English |
Published: |
Washington, DC :
U.S. Govt. Accountability Office,
[2011]
|
Physical Description: |
1 online resource (45 pages) |
Subjects: | |
Online Access: |
https://purl.fdlp.gov/GPO/gpo11841 |
In Prospector
Similar Items
-
Depot maintenance Air Force is assessing engine maintenance options for work currently performed at Kelly Aviation Center
by: Edwards, Jack E.
Published: (2011) -
DOD's 2010 Comprehensive Inventory Management Improvement Plan addressed statutory requirements, but faces implementation challenges
by: Edwards, Jack E.
Published: (2011) -
Defense logistics oversight and a coordinated strategy needed to implement the Army workload and performance system
by: Edwards, Jack E.
Published: (2011) -
Depot maintenance sustainment strategy for Harrier aircraft could be enhanced with additional metrics
by: Edwards, Jack E.
Published: (2010) -
Defense logistics DOD has taken actions to improve some segments of the materiel distribution system
by: Russell, Cary B.
Published: (2012)