|
|
|
|
LEADER |
01576cam a22003851 4500 |
001 |
2296015 |
003 |
OCoLC |
005 |
19951107111915.0 |
008 |
740801s1966 dcuab 000 0 eng |
010 |
|
|
|a 66062001 //r86
|
040 |
|
|
|a DLC
|b eng
|c DLC
|d COM
|
049 |
|
|
|a COMN
|
050 |
0 |
4 |
|a TN295
|b .U4 no. 8294
|
082 |
1 |
|
|a 624.193
|
086 |
|
|
|a I 28.27:8294
|
100 |
1 |
|
|a Howes, Merwin H.
|
245 |
1 |
0 |
|a Methods and costs of constructing the underground facility of North American Air Defense Command at Cheyenne Mountain, El Paso County, Colo. /
|c by Merwin H. Howes.
|
264 |
|
1 |
|a [Washington] :
|b U.S. Dept. of the Interior, Bureau of Mines,
|c [1966]
|
300 |
|
|
|a iii, 69 pages :
|b illustrations, map. ;
|c 27 cm.
|
336 |
|
|
|a text
|b txt
|2 rdacontent.
|
337 |
|
|
|a unmediated
|b n
|2 rdamedia.
|
338 |
|
|
|a volume
|b nc
|2 rdacarrier.
|
490 |
1 |
|
|a United States. Bureau of Mines. Information circular ;
|v 8294.
|
610 |
2 |
0 |
|a North American Air Defense Command.
|
650 |
|
0 |
|a Underground construction.
|
830 |
|
0 |
|a Information circular (United States. Bureau of Mines) ;
|v 8294.
|
907 |
|
|
|a .b12558254
|b cug
|c -
|d 010628
|e 240510
|
998 |
|
|
|a cug
|b 010601
|c m
|d a
|e -
|f eng
|g dcu
|h 0
|i 0
|
902 |
|
|
|a 060630
|
948 |
|
|
|a MARCIVE Comp, in 2022.12
|
948 |
|
|
|a MARCIVE August, 2017
|
948 |
|
|
|a MARCIVE extract Aug 5, 2017
|
995 |
|
|
|a Loaded with m2btab.ltiac in 2022.12
|
995 |
|
|
|a Loaded with m2btab.ltiac in 2017.08
|
989 |
|
|
|a I 28.27:8294
|d cusgb
|b 1080004303720
|e 08-30-2005 13:07
|f - -
|g -
|h 1
|i 0
|j 18
|k 010628
|l $0.00
|m
|n 10-14-2005 7:54
|o -
|p 371
|q 371
|t 0
|x 0
|1 .i13854239
|