|
|
|
|
LEADER |
03312nam a2200637 i 4500 |
001 |
681184472 |
003 |
OCoLC |
005 |
20210122112745.0 |
006 |
m o d f |
007 |
cr b|||||||||| |
008 |
101112s1988 pauabf ob f000 0 eng c |
019 |
|
|
|a 621858047
|a 667889525
|a 974646079
|
040 |
|
|
|a OCLCE
|b eng
|e rda
|e pn
|c OCLCE
|d OCLCQ
|d OCLCO
|d OCLCQ
|d COP
|d OCLCF
|d GPO
|d MvI
|
042 |
|
|
|a pcc
|
043 |
|
|
|a n-us-pa
|
049 |
|
|
|a COM7
|
074 |
|
|
|a 0624-B-05 (online)
|
086 |
0 |
|
|a I 19.42/4:88-4087
|
100 |
1 |
|
|a Fishel, David K.,
|e author.
|
245 |
1 |
0 |
|a Preimpoundment hydrologic conditions in the Swatara Creek (1981-84) and estimated postimpoundment water quality in and downstream from the planned Swatara State Park Reservoir, Lebanon and Schuylkill counties, Pennsylvania /
|c by David K. Fishel ; prepared in cooperation with the Pennsylvania Department of Environmental Resources, Bureau of State Parks.
|
264 |
|
1 |
|a Harrisburg, Pennsylvania :
|b U.S. Geological Survey,
|c 1988.
|
300 |
|
|
|a 1 online resource (vi, 108 pages) :
|b illustrations, maps +
|e 2 plates.
|
336 |
|
|
|a text
|b txt
|2 rdacontent.
|
337 |
|
|
|a computer
|b c
|2 rdamedia.
|
338 |
|
|
|a online resource
|b cr
|2 rdacarrier.
|
490 |
1 |
|
|a Water-resources investigations report ;
|v 88-4087.
|
588 |
|
|
|a Description based on online resource; title from PDF title page (USGS, viewed Dec. 16, 2020).
|
504 |
|
|
|a Includes bibliographical references (pages 106-108).
|
500 |
|
|
|a GPO Cataloging Record Distribution Program (CRDP).
|
650 |
|
0 |
|a Hydrology
|z Pennsylvania
|z Lebanon County.
|
650 |
|
0 |
|a Hydrology
|z Pennsylvania
|z Schuylkill County.
|
650 |
|
0 |
|a Water quality
|z Pennsylvania
|z Lebanon County.
|
650 |
|
0 |
|a Water quality
|z Pennsylvania
|z Schuylkill County.
|
650 |
|
0 |
|a Coal mines and mining
|x Environmental aspects
|z Pennsylvania.
|
650 |
|
0 |
|a Mine drainage
|x Environmental aspects
|z Pennsylvania.
|
650 |
|
0 |
|a Reservoirs
|z Pennsylvania
|z Swatara State Park.
|
650 |
|
7 |
|a Coal mines and mining
|x Environmental aspects.
|2 fast.
|
650 |
|
7 |
|a Mine drainage
|x Environmental aspects.
|2 fast.
|
650 |
|
7 |
|a Stream measurements.
|2 fast.
|
650 |
|
7 |
|a Water quality.
|2 fast.
|
651 |
|
7 |
|a Pennsylvania
|z Lebanon County.
|2 fast.
|
651 |
|
7 |
|a Pennsylvania
|z Schuylkill County.
|2 fast.
|
710 |
2 |
|
|a Geological Survey (U.S.),
|e issuing body.
|
710 |
1 |
|
|a Pennsylvania.
|b Bureau of State Parks.
|
776 |
0 |
8 |
|i Print version:
|a Fishel, David K.
|t Preimpoundment hydrologic conditions in the Swatara Creek (1981-84) and estimated postimpoundment water quality in and downstream from the planned Swatara State Park Reservoir, Lebanon and Schuylkill counties, Pennsylvania
|w (OCoLC)18994165.
|
830 |
|
0 |
|a Water-resources investigations report ;
|v 88-4087.
|
856 |
4 |
0 |
|u https://purl.fdlp.gov/GPO/gpo149235
|
907 |
|
|
|a .b63587427
|b cug
|c -
|d 210212
|e 230210
|
998 |
|
|
|a cug
|b 210212
|c m
|d a
|e -
|f eng
|g pau
|h 0
|i 1
|
922 |
|
|
|a BIBCONEW
|b 20210122
|
948 |
|
|
|a MARCIVE Overnight, in 2023.02
|
948 |
|
|
|a MARCIVE Over, 03/2021
|
995 |
|
|
|a Loaded with m2btab.ltiac in 2023.02
|
995 |
|
|
|a Loaded with m2btab.ltiac in 2021.03
|
995 |
|
|
|a Loaded with m2btab.msgov7 in 2021.02
|
989 |
|
|
|a I 19.42/4:88-4087
|d cuege
|e - -
|f - -
|g j
|h 0
|i 0
|j 216
|k 210212
|l $0.00
|m
|n - -
|o -
|p 0
|q 0
|t 0
|x 0
|w US Gov Docs
|1 .i136420175
|