Ute Mountain Ute La Plata Watershed final report design & cost estimate for off-farm irrigation facilities & PIA determination.
The purpose of this task report is to present the methodology for determining practicably irrigable acreage (PIA) for the Ute Mountain Ute La Plata Watershed on the Ute Mountain Ute Reservation. The test for PIA requires that the revenues exceed the cost. The land under consideration when cropped an...
Other Authors: | Boyle Engineering Corporation., Colorado. Department of Law. |
---|---|
Format: | Electronic |
Language: | English |
Published: |
Fresno, Calif. :
Boyle Engineering Corporation,
1986.
|
Physical Description: |
1 online resource (1 volume in various pagings). |
Series: |
Agricultural engineering study, Southern Ute & Ute Mountain, Ute Indian Reservations.
|
Subjects: | |
Online Access: |
Access online |