Production control systems a guide to enhance performance of pull systems /

Selecting a suitable production control policy is a challenging task for managers because the superiority of one control over the other is controversial. This book analyzes pull production systems and provides a guideline to choose and implement a proper control policy in production processes. By em...

Full description

Main Author: Khojasteh, Yacob,
Other Authors: SpringerLink (Online service)
Format: eBook
Language: English
Published: Tokyo : Springer, [2016]
Physical Description: 1 online resource (xx, 105 pages) : color illustrations.
Series: Management for professionals.
Subjects:
LEADER 06436cam a2201153 i 4500
001 919123020
003 OCoLC
005 20240223121953.0
006 m o d
007 cr cnu---unuuu
008 150825s2016 ja a ob 000 0 eng d
015 |a GBB959622  |2 bnb 
016 7 |a 019320829  |2 Uk 
019 |a 919341720  |a 936862417  |a 985039614  |a 993043497  |a 1005832372  |a 1011993244  |a 1018385962  |a 1026467872  |a 1048127646  |a 1066619428  |a 1111071504  |a 1112569630  |a 1113037163 
020 |a 9784431551973  |q (electronic bk.) 
020 |a 4431551972  |q (electronic bk.) 
020 |a 4431551964  |q (print) 
020 |a 9784431551966  |q (print) 
020 |z 9784431551966 
024 7 |a 10.1007/978-4-431-55197-3  |2 doi 
035 |a (OCoLC)919123020  |z (OCoLC)919341720  |z (OCoLC)936862417  |z (OCoLC)985039614  |z (OCoLC)993043497  |z (OCoLC)1005832372  |z (OCoLC)1011993244  |z (OCoLC)1018385962  |z (OCoLC)1026467872  |z (OCoLC)1048127646  |z (OCoLC)1066619428  |z (OCoLC)1111071504  |z (OCoLC)1112569630  |z (OCoLC)1113037163 
037 |a com.springer.onix.9784431551973  |b Springer Nature 
040 |a N$T  |b eng  |e rda  |e pn  |c N$T  |d GW5XE  |d N$T  |d IDEBK  |d YDXCP  |d COO  |d OCLCF  |d CDX  |d EBLCP  |d OCLCQ  |d KSU  |d IDB  |d JG0  |d IAD  |d JBG  |d ICW  |d VT2  |d ESU  |d Z5A  |d ILO  |d ICN  |d OCLCQ  |d FIE  |d IOG  |d U3W  |d MERUC  |d LOA  |d REB  |d VLB  |d INT  |d OCLCQ  |d WYU  |d OCLCQ  |d STF  |d BRX  |d UKMGB  |d AU@  |d OCLCQ  |d DCT  |d ERF  |d UKBTH  |d OCLCQ  |d WURST  |d NLW  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL 
049 |a COM6 
050 4 |a TS157 
072 7 |a TEC  |x 009060  |2 bisacsh 
072 7 |a TEC  |x 018000  |2 bisacsh 
072 7 |a TEC  |x 020000  |2 bisacsh 
072 7 |a TEC  |x 040000  |2 bisacsh 
072 7 |a KCD  |2 bicssc 
082 0 4 |a 670.42/7  |2 23 
100 1 |a Khojasteh, Yacob,  |e author. 
245 1 0 |a Production control systems :  |b a guide to enhance performance of pull systems /  |c Yacob Khojasteh. 
264 1 |a Tokyo :  |b Springer,  |c [2016] 
264 4 |c ©2016. 
300 |a 1 online resource (xx, 105 pages) :  |b color illustrations. 
336 |a text  |b txt  |2 rdacontent. 
337 |a computer  |b c  |2 rdamedia. 
338 |a online resource  |b cr  |2 rdacarrier. 
347 |a text file. 
347 |b PDF. 
490 1 |a Management for professionals,  |x 2192-8096. 
588 0 |a Online resource; title from PDF title page (EBSCO, viewed August 26, 2015). 
504 |a Includes bibliographical references. 
505 0 |a Introduction (Pull and Push Systems, Just-in-Time Systems, Need for Control Systems in a Pull Context) -- Unified View of Pull Production Systems -- The Magic of Pull Production Systems -- A Unified Framework for Production Control Systems -- Analysis of Control Systems in Serial Production Lines -- Analysis of Control Systems in Assembly Production Systems -- Conclusions -- Appendix. 
520 |a Selecting a suitable production control policy is a challenging task for managers because the superiority of one control over the other is controversial. This book analyzes pull production systems and provides a guideline to choose and implement a proper control policy in production processes. By employing a proper control policy the maximum possible throughput of the production system can be achieved with the minimum work-in-process inventory. Kanban, CONWIP, and base-stock as well-known pull control policies are analyzed and analytical comparisons among them in multistage serial and assembly production processes are presented. Illustrated by carefully chosen examples and supported by analytical solutions, discussions provided in the book clarify the complexity of the comparisons that show there is no general superiority among the control systems. The book explains which structural parameters decide the superiority of one control scheme to the others, and how they are related. Given a configuration of parameters, such as processing times and number of cards employed in the system, the superior control policy can be selected. 
546 |a English. 
650 0 |a Production control. 
650 0 |a Production engineering. 
650 6 |a Production  |x Contrôle. 
650 6 |a Technique de la production. 
650 7 |a TECHNOLOGY & ENGINEERING  |x Industrial Engineering.  |2 bisacsh. 
650 7 |a TECHNOLOGY & ENGINEERING  |x Industrial Technology.  |2 bisacsh. 
650 7 |a TECHNOLOGY & ENGINEERING  |x Manufacturing.  |2 bisacsh. 
650 7 |a TECHNOLOGY & ENGINEERING  |x Technical & Manufacturing Industries & Trades.  |2 bisacsh. 
650 7 |a Production control.  |2 fast. 
650 7 |a Production engineering.  |2 fast. 
653 0 0 |a ketenmanagement. 
653 0 0 |a supply chain management. 
653 0 0 |a logistiek. 
653 0 0 |a logistics. 
653 0 0 |a operationeel onderzoek. 
653 0 0 |a operations research. 
653 0 0 |a economie. 
653 0 0 |a economics. 
653 0 0 |a bedrijfswetenschap. 
653 0 0 |a management science. 
653 0 0 |a industrial organization. 
653 1 0 |a Management studies, Business Administration, Organizational Science (General) 
653 2 0 |a Economics (General) 
653 1 0 |a Management, bedrijfskunde, organisatiekunde (algemeen) 
653 2 0 |a Economie (algemeen) 
710 2 |a SpringerLink (Online service) 
776 0 8 |i Printed edition:  |z 9784431551966. 
830 0 |a Management for professionals. 
907 |a .b49870282  |b multi  |c -  |d 160303  |e 240320 
998 |a (3)cue  |a cu  |b 240227  |c m  |d z   |e -  |f eng  |g ja   |h 0  |i 2 
948 |a MARCIVE Overnight, in 2024.03 
948 |a MARCIVE Comp, in 2023.01 
948 |a MARCIVE Over, 07/2021 
948 |a MARCIVE Comp, 2019.12 
948 |a MARCIVE Comp, 2018.05 
948 |a MARCIVE August, 2017 
948 |a MARCIVE extract Aug 5, 2017 
994 |a 92  |b COM 
995 |a Loaded with m2btab.ltiac in 2024.03 
995 |a Loaded with m2btab.elec in 2024.02 
995 |a Loaded with m2btab.ltiac in 2023.01 
995 |a Loaded with m2btab.ltiac in 2021.07 
995 |a Loaded with m2btab.elec in 2021.06 
995 |a Loaded with m2btab.ltiac in 2019.12 
995 |a Loaded with m2btab.ltiac in 2018.06 
995 |a Loaded with m2btab.ltiac in 2017.09 
995 |a Loaded with m2btab.elec in 2016 
995 |a Loaded with m2btab.elec in 2016 
995 |a OCLC offline update by CMU 
999 |e z 
999 |a cue 
989 |d cueme  |e  - -   |f  - -   |g -   |h 0  |i 0  |j 200  |k 240227  |l $0.00  |m    |n  - -   |o -  |p 0  |q 0  |t 0  |x 0  |w SpringerLink  |1 .i150431193  |u http://ezproxy.coloradomesa.edu/login?url=https://link.springer.com/10.1007/978-4-431-55197-3  |3 SpringerLink  |z Click here for access