|
|
|
|
LEADER |
01717cam a2200433Ia 4500 |
001 |
10480634 |
003 |
OCoLC |
005 |
19990924131122.0 |
008 |
840302s1955 dcu b f000 0 eng d |
040 |
|
|
|a UDI
|b eng
|c UDI
|d COM
|
049 |
|
|
|a COMN
|
099 |
|
|
|a TEI
|a 505
|
100 |
1 |
|
|a Flanagan, F. J.
|q (Francis James),
|d 1915-
|
245 |
1 |
2 |
|a A comparison of sample splitting methods /
|c by Francis J. Flanagan and Richard C. Kellagher.
|
264 |
|
1 |
|a Washington, D.C. :
|b U.S. Dept. of the Interior, Geological Survey,
|c [1955]
|
300 |
|
|
|a 16 leaves ;
|c 27 cm.
|
336 |
|
|
|a text
|b txt
|2 rdacontent.
|
337 |
|
|
|a unmediated
|b n
|2 rdamedia.
|
338 |
|
|
|a volume
|b nc
|2 rdacarrier.
|
490 |
1 |
|
|a Trace elements investigations report,
|x 0499-5252 ;
|v 505.
|
500 |
|
|
|a Work done on behalf of the Division of Raw Materials, U.S. Atomic Energy Commission.
|
500 |
|
|
|a "March 1955."
|
504 |
|
|
|a Bibliography: leaf 16.
|
650 |
|
0 |
|a Ores
|x Sampling and estimation.
|
650 |
|
0 |
|a Metallurgy
|x Technique.
|
700 |
1 |
|
|a Kellagher, R. C.
|q (Richard C.)
|
710 |
2 |
|
|a Geological Survey (U.S.)
|
710 |
2 |
|
|a U.S. Atomic Energy Commission.
|b Division of Raw Materials.
|
830 |
|
0 |
|a Trace elements investigations report ;
|v 505.
|
907 |
|
|
|a .b12739959
|b cu
|c -
|d 010628
|e 230519
|
998 |
|
|
|a cu
|b 010601
|c m
|d a
|e -
|f eng
|g dcu
|h 2
|i 0
|
902 |
|
|
|a 060630
|
948 |
|
|
|a MARCIVE Comp, in 2022.12
|
948 |
|
|
|a MARCIVE August, 2017
|
948 |
|
|
|a MARCIVE extract Aug 5, 2017
|
994 |
|
|
|a 01
|b COM
|
995 |
|
|
|a Loaded with m2btab.ltiac in 2022.12
|
995 |
|
|
|a Loaded with m2btab.ltiac in 2017.08
|
989 |
|
|
|a TEI
|a 505
|d culsr
|b 1080004800176
|e - -
|f - -
|g o
|h 0
|i 0
|j 175
|k 010628
|l $0.00
|m
|n - -
|o -
|p 0
|q 0
|t 0
|x 0
|1 .i1408272x
|