Preliminary directives concerning water supply and dewatering in the reconditioning of protection bunkers
Saved in:
Main Author: | Germany (West). Bundesministerium für Wohnungsbau. |
---|---|
Other Authors: | Germany (West). Bundesministerium des Innern. |
Format: | Book |
Language: | English |
Published: |
[Washington] :
U. S. Atomic Energy Commission, Office of Technical Information,
[1960]
|
Physical Description: |
12 pages ; 27 cm. |
Series: |
AEC-tr ;
3893. |
Subjects: |
In Prospector
Similar Items
-
Provisional specifications for consolidation work in the reconditioning of protective bunkers
by: Germany (West). Bundesministerium für Wohnungsbau.
Published: (1960) -
Specifications for radiationproof shelters
by: Germany (West). Bundesministerium für Wohnungsbau.
Published: (1960) -
Specifications for blastproof shelters
by: Germany (West). Bundesministerium für Wohnungsbau.
Published: (1960) -
Preliminary procedures for the installation of ventilation systems during the reconditioning of protective bunkers
Published: (1960) -
Provisional specifications for the installation of electric high- and low-current systems in reconditioning work on protective bunkers
Published: (1960)