D 103.24/2:HL-89-2
|
West Access Channel realignment, Atchafalaya River hydraulic model investigation |
1 |
D 103.24/2:HL-89-3
|
Effects of Cooper River rediversion flows on shoaling conditions at Charleston Harbor, Charleston, South Carolina |
1 |
D 103.24/2:HL-89-4
|
Water quality outlet works prototype tests, Warm Springs Dam, Dry Creek, Russian River Basin, Sonoma County, California |
1 |
D 103.24/2:HL-89-7
|
Little Dell outlet structure hydraulic model investigation |
1 |
D 103.24/2:HL-89-10
|
Navigation conditions at Gallipolis Locks and Dam, Ohio River hydraulic model investigation |
1 |
D 103.24/2:HL-89-12
|
Newport News channel deepening study, Virginia numerical model investigation |
1 |
D 103.24/2:HL-89-13
|
Intake structure operation study, Lost Creek Dam, Oregon |
1 |
D 103.24/2:HL-89-14
|
Verification of the hydrodynamic and sediment transport hybrid modeling system for Cumberland Sound and Kings Bay navigation channel, Georgia |
1 |
D 103.24/2:HL-89-17
|
Kinzua Dam, Allegheny River, Pennsylvania and New York hydraulic model investigation |
1 |
D 103.24/2:HL-89-18
|
Clover Fork Tunnel Diversion Project, Harlan, Kentucky hydraulic model investigation |
1 |
D 103.24/2:HL-89-19
|
Model study of Prado flood-control dam hydraulic model investigation |
1 |
D 103.24/2:HL-89-22
|
An Analysis of training structure designs in Southwest Pass, Mississippi River |
1 |
D 103.24/2:HL-89-23
|
Winyah Bay, Georgetown, South Carolina data collection survey report |
1 |
D 103.24/2:HL-89-27
|
Navigation conditions at Oliver Lock and Dam, Black Warrior River Project hydraulic model investigation |
1 |
D 103.24/2:HL-90-1
|
Formed suction intake approach appurtenance geometry |
1 |
D 103.24/2:HL-90-5
|
Numerical modeling of hydrodynamics Brazos Island Harbor Project, Texas (Brownsville Ship Channel) |
1 |
D 103.24/2:HL-90-6
|
San Francisco Central Bay suspended sediment movement. Report 1, Summer condition data collection program and numerical model verification |
1 |
D 103.24/2:HL-90-7
|
Mississippi River-Gulf Outlet, Louisiana field data report |
1 |
D 103.24/2:HL-90-8
|
Yazoo Backwater Pumping Station sump, West-Central Mississippi hydraulic model investigation |
1 |
D 103.24/2:HL-90-9
|
Red River Waterway revised outlets for Red River Locks : hydraulic model investigation |
1 |