D 103.24/2:HL-88-10
|
Dynamic loading on sidewall monoliths of a spillway stilling basin hydraulic model investigation |
1 |
D 103.24/2:HL-88-12
|
Steele Bayou Gravity Control Structure, Vicksburg, Mississippi hydraulic model investigation |
1 |
D 103.24/2:HL-88-14
|
Old River Control Auxiliary Structure hydraulic model investigation |
1 |
D 103.24/2:HL-88-21
|
Martins Fork Lake sedimentation study hydraulic model investigation |
1 |
D 103.24/2:HL-88-23
|
Wax Lake Outlet control structure, Louisiana hydraulic model investigation |
1 |
D 103.24/2:HL-88-24
|
New Haven Harbor numerical model study |
1 |
D 103.24/2:HL-88-26
|
Telegraph Canyon Creek Channel Improvement Project, San Diego County, California hydraulic model investigation |
1 |
D 103.24/2:HL-88-29
|
Wax Lake Outlet control structure, Atchafalaya River hydraulic model investigation |
1 |
D 103.24/2:HL-89-1
|
Submersible-type tainter gate for spillway, Marseilles Lock and Dam hydraulic model investigation |
1 |
D 103.24/2:HL-89-2
|
West Access Channel realignment, Atchafalaya River hydraulic model investigation |
1 |
D 103.24/2:HL-89-3
|
Effects of Cooper River rediversion flows on shoaling conditions at Charleston Harbor, Charleston, South Carolina |
1 |
D 103.24/2:HL-89-4
|
Water quality outlet works prototype tests, Warm Springs Dam, Dry Creek, Russian River Basin, Sonoma County, California |
1 |
D 103.24/2:HL-89-7
|
Little Dell outlet structure hydraulic model investigation |
1 |
D 103.24/2:HL-89-10
|
Navigation conditions at Gallipolis Locks and Dam, Ohio River hydraulic model investigation |
1 |
D 103.24/2:HL-89-12
|
Newport News channel deepening study, Virginia numerical model investigation |
1 |
D 103.24/2:HL-89-13
|
Intake structure operation study, Lost Creek Dam, Oregon |
1 |
D 103.24/2:HL-89-14
|
Verification of the hydrodynamic and sediment transport hybrid modeling system for Cumberland Sound and Kings Bay navigation channel, Georgia |
1 |
D 103.24/2:HL-89-17
|
Kinzua Dam, Allegheny River, Pennsylvania and New York hydraulic model investigation |
1 |
D 103.24/2:HL-89-18
|
Clover Fork Tunnel Diversion Project, Harlan, Kentucky hydraulic model investigation |
1 |
D 103.24/2:HL-89-19
|
Model study of Prado flood-control dam hydraulic model investigation |
1 |