ANA facilities at Mazar-e-Sharif and Herat generally met construction requirements, but contractor oversight should be strengthened

Main Author: United States. Office of the Special Inspector General for Afghanistan Reconstruction.
Format: Electronic
Language: English
Published: Arlington, VA : Office of the Special Inspector General for Afghanistan Reconstruction, [2011]
Physical Description: 1 online resource (iv, 24 pages) : color illustrations.
Series: SIGAR audit ; 11-9.
Subjects:
Online Access: https://purl.fdlp.gov/GPO/gpo27319
https://purl.fdlp.gov/GPO/gpo27319

CMU Gov Pub Electronic

LocationCall Number: Status
CMU Gov Pub Electronic S 1.163/2:11-9 Online